BEI performed a post Superstorm Sandy cleanup project for the US Army Corps of Engineers at Plumb Beach in Brooklyn, NY.
This site is a NYC park located directly off of the Belt Parkway in Sheepshead Bay, Brooklyn. BEI removed all of the displaced sand from Superstorm Sandy. BEI then created a new dune with the sand along the waterfront and planted the dune with a mix of trees, shrubs, and dune grass. BEI also hydroseeded and installed erosion control fencing throughout the project. Finally, BEI cleaned the existing parking lot and walking trail of all of the sand and debris left from the storm.